Bill England, backflow technician at Lake Station's water filtration plant,  looks at the schematic for the water system. He works for Utility Services, which was hired by the city to run the plant.
Share
twitterlinkedinfacebook

Bill England, backflow technician at Lake Station's water filtration plant, looks at the schematic for the water system. He works for Utility Services, which was hired by the city to run the plant.

Filename: 20161110_8501.jpg
Source: John Nelson
Date: 10 Nov 2016
Location: Lake Station Indiana USA
Credit: www.johnnelsonphoto.com
Copyright:
Model Release: No
Property Release: No
Restrictions: No reproduction without permission
Direct Link:
Keywords:
  • tap water
  • water
  • water infrastructure